SOLEIL is the French national 2,75 GeV third generation synchrotron installation. CNRS and the CEA created the public company SOLEIL Synchrotron, called to lead the construction and then the operation of SOLEIL. Alongside them, the Region Ile de France and the Conseil General de l’Essonne have insured nearly 80% of capital costs. The Region Centre is also a SOLEIL partner.

History

The decision to build has been made in September 2001. The works started a year later and the storage ring started its operation in 2006. The beamlines have been progressively opened to the users: 11 beamlines open to first users in 2008, 20 in 2011 and 29 scheduled for 2014. Topping up injection mode and single bunch are available since 2009, and routinely achieved since 2010. Operation is now reached at 400mA and will be offered to users in 2012 at the level of 500mA.

Performances

SOLEIL is at the cutting edge of third generation performances, in its energy range, with an exceptional effort in stability and brilliance achievements, as recognised by its international Scientific Advisory Committee. Insertion devices have been optimised for each ID beamline, with original and unique solution at low energy (electromagnetic undulators HU640, HU256). SOLEIL offers a unique panorama of experiments in surface and material science (with emphasis given on microspectroscopies, high resolution, magnetism, chemistry), environmental and earth science, very dilute species, biology (crystallography, absorption, small angle scattering, fluorescence, IR microscopy). Areas of excellence are time resolved experiment both in X-ray range (diffraction, photoemission) and in the softer energy range (coincidences spectroscopies at ultrahigh resolution), an extensive use of versatile photon polarisations (dichroism studies), fully automated protein crystallography beamlines, a dedicated radioactive elements beamline etc. Special emphasis will be given towards cultural heritage material studies with a dedicated platform (IPANEMA) in construction, as well as a global approach in life science from the molecule to cells and tissue investigation. Imaging at SOLEIL is already present on numerous beamlines and will be reinforced in the very next future.

SOLEIL
Beamlines
contacts
Societe Civile Synchrotron SOLEIL
L’Orme des Merisiers, St Aubin - BP 48 Gif-sur-Yvette Cedex
TEL. + 33 1 69 35 96 52
SOLEIL
Brilliance
SOLEIL
beamstatus
SOLEIL
calls for proposals
2025-03-17
Rolling proposal

Rolling Proposal give the opportunity to carry out experiments on the CryoEM-Krios "POLARIS", with continuous submission and reviewing every 2 months.

Please finde here the current submission calendar.


2025-09-15
Classic BAG (Block Allocation Group)

Classic BAG are proposals clustering multiple teams sharing either a similar thematic or a similar technique that required a specific set-up.

There is no limitation in the number of teams gathering or in the number of shifts requested.

Classic BAG submission is open only once a year during calls from mid-July to mid-September.

Accepted Classic BAG experiment can start from March of the next year.

These proposals have a one year duration, with a mid-term reevaluation after six months.


2025-09-15
MX-BioSAXS BAG (Block Allocation Group)

MX-BioSAXS BAG are proposals clustering multiple teams sharing either a similar thematic or a similar location.

Currently this type of proposal is dedicated for MX and BioSAXS analysis.

There is no limitation in the number of teams gathering or in the number of shifts requested.

MX-BioSAXS BAG submission is open only once a year during calls from mid-July to mid-September.

Accepted MX-BioSAXS BAG experiment can start from March of the next year.

These proposals have a two years duration, with a mid-term reevaluation after one year.


2025-09-15
Standard proposal

SOLEIL has two calls per year which covers beamtime from March to July (1st semester) and from September to February (2nd semester).

Openings of the calls are usually planned in July for beamtime allocation during the 1rst semester and in December for beamtime allocation during the 2nd semester.


2025-12-31
Rapid Access

Rapid Acces proposals are a way to obtain free beamtime on decision of the Experimental Division Direction.

Thay are submitted continiously but are limited to a really small number of proposals, only for urgent work.